Description: Replacement of SK II vapour line Name of Work Replacement of SK II vapour line Pan No 4 to 8 Entrusting the work to Labour Contractor
Details: Replacement of SK-II vapour line (Pan No.4 to 8) 1. Dismantling of Damaged SK-II vapour line (Pan No.4 to 8) and lead to Scrap yard2. Fabrication and of SK-II vapour line (Pan No.4 to 8) by 12mm thick M.S plate.3. Fabrication and of Manhole door as per existing location.4. Providing necessary vent lines with valves as per existing points.5. Adequate supports to be given to vapour lines.6. The Approximate weight of the contract work will be around 6.0 MT NOTE: before quote rivew the scope of work and terms and conditions
Sector: Sugar