Details: demolishing the existing brick pedestal,earth work excavation & refilling, constructing of new red brick pedestal with fine plastering and painting. the job includes of disconnection of existing electrical box should be done by the contractor scope.note:1) excavation & refilling area size - upto 1500mm ø x depth 600mm.2) brick pedestal size - (l - 1' x h - 2' x w - 1') 3) paint colour - green providing of 4c x 25 sq.mm m-seal cable joint kit and make a joint for existing cables.note:1. filling an m-seal up to saturation level of the kit. 2. re-connection of cables in electrical box should be done by the contractor scope providing of ip 65 6way double door type weather proof box in the existing road light pole with suitable clamp or welding and ss fasteners and accessories. the box comprising of 1 no 32a 4 way bolt & nuts type smc terminal block and 1 no c6a sp mcb. note: 1. ip65 weather proof box - make: legrand / hensel 2.mcb - legrand / hager / siemens 3. terminal block - any isi
Sector: Science University