Details: maintenance of the road from paparapatty road to sengankottai road clearing light jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. earth work excavation and depositing on bank with in lead the lift in hard stiff clay, stiff black cotton hard red earth, shales, murams, ordinary gravel, stone earth mixed with small size boulders, hard gravelly soil etc, as per ss.20. etc .comp. km.0/0-1/850 collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc complete km.0/0-1/00 km.1/00-1/850 advance patch work for making up the undulation in the existing b.t surface to an average thickness of 25mm using 13.20 mm size hbg metal. km.0/0-1/00 km.1/00-1/850 providing and applying tack coat with bitumen emulsion (rs-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the p
Sector: Road development