Details: providing and laying tack coat over wbm/ wmm surface (treated with primer) using 2.00 kg of bitumen emulsion (rs1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 503 of morth rev-5 providing and laying bituminous concrete 30mm consolidated thick using 0.13 of 19.00 – 9.50mm,0.17 of 9.50-2.36mm and 0.26 of 2.36 mm & below with 45.27 kgs of 60/70 grade bulk bitumen 5.03 kg of shredded plastic waste for premixing per 10 sqm including cost and conveyance of all materials to cmp site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by vibratory/pneumat
Sector: RDPR