Details: name of the work : upgradation the road from soliyamman kovil back side road km.0/0-0/520 clearing the scrub jungle including all labour charges for burrying and burning etc., providing and laying gravel soiling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete construction of granular sub base by providing well graded material (25 mm to 4.75 mm irc hbg metal @ 65%,4.75 to 2.36mm irc hbg metal @20%&2.36 mm below irc hbg metal @15%) & (the material passing 425 microns sleve shall have liquid limit and plasticity providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including pre
Sector: RDPR