Details: earthwork excavation for foundation in all soils and sub soils to full depth as may be directed , except in hard rock,requiring blasting inclusive of shoring, shuttering and baling out water wherever necessary,refilling the sides of foundation with excavated sand (or) earth in layers of not more than 15cm thick well rammed and consolidated , depositing the surplus earth with the compound in place shown by the deptl, officers with initial lead and lifts, clearing and levelling the site etc complete. providing cost in situ rcc 1:1 1/2:3 (one cement, one and half sand and three hard broken granite stones) for 30cm dia under reamed pile foundation including cost of labour, materials and hire charges for equipment etc. with over head charges for 3.00m depth and 3.50m including hire charges for dewatering if necessary before counting using sinle under reamed 30cm dia pile (capacity of pile 1 & 24 tonne) for 3.00 depth etc. complete as directed by the departmental officers. supplying and fil
Sector: PWD