Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 supply and delivery of pvc &gi specials ncluding cost for materials and all labour charges for completed 75mm dia hdpe pipe 12.5 75mm dia hdpe bend 50mm gi pipe 50mm gi coupling 50mm gm gate valve 50mm elbow conveyance of pipe line including all cost and conveyance all cost etc 75mm dia hdpe pipe 12.5 refilling the excavated earth including all cost and conveyance charges etc 75mm dia hdpe pipe 12.5 jointing hdpe pipes and specials by fusion welding / electro fusion welding joints using fusion equipment as pe
Sector: RDPR