Details: construction of granular sub-base by providing close graded material,mixing in a machanical plant at omc,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,complete as per clause 401. providing and laying well gravel to the specified thick including cost and conveyance of well gravel from approved quarry and stocking the same at road side to departmental guage for premeasurement as directed by the departmental officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of morth edge packing providing and laying wet mix mecadam using 0.396m3 of 45
Sector: RDPR