Details: earth work excavation excavating and depositing on bank with initial lead of 10 metres and initial lift of 2 metres in hard stiff clay, stiff black cotton soils, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders ss 20 b cement concrete 1:4:8 mix (one cement, four sand and eight aggregate) using 40mm gauge hard broken stone jelly for foundation and flooring including dewatering if found necessary and laid in layers of not more than 15cm thick and compacting including all charges etc., complete as per standard specification. plain cement concrete 1:11/2:3 mix (one part cement, two part sand and four part of aggrigate) using 20mm size iss hbg metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. complying with std. specifications. providing bitumen felt 15mm thick for expansion joint including cost and
Sector: RDPR