Details: clearing the light jungle on either side road as per standard specification as directed by the departmental officers and including all other incidental charges etc., complete. as per mort & h 111, 112, 201 excavation including removal and satisfactory disposal of all materias necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or as indicated by the engineer for box cutting for wideneing portion as per morth specification no. 111, 112,301, 305 & 900. providing and laying granular sub-base as per table no.400-1/400-2 and grading v of mort&h revision v with and any other granular material or a combination those of for required thick to give a cbr of 30 on prepared sub-grade in accordance with the requirements of the specification as per mort&h vth revision 111, 112, 401, 900 picking the existing bt surface, leveling and sectioning in accordance with specifications and as directe
Sector: Road development