Details: charges for carrying out coal dozing works like levelling, ramping, stacking and advancing, feeding etc., at ttps coal yard by carrying 2 nos dozers (each dozer availability for 24 hours) and diesel consumption is 13 ltr/hour/dozer as and when required. [diesel will be supplied under tnpgcl scope). charges for operating the bull dozers for levelling, ramping the coal received from ships and other modes and further stacking the coal in coal yard, advancing the coal to reclaimer machines reach and tunnel conveyor for bunker feeding and other works as instructed by the engineer - in charge.
Sector: Power Sector