Details: main road work clearing the light jungle without uprooting including all cost and conveyance and all other incidental charges etc. complete as per sl., no. 9d diamantling the existing hard bed and clearing away from the worksite and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidnetal charges etc., complete. w-0034. granular sub base with graded material(table-400-1)-plant mix method (construction of granular sub base by providing close graded material ,mixing in a mechanical mix plant at omc,carriage of mixed material to worksite,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per clause 401)- for grading v material (specification number as per morth rev.v 111,112,401,900) wet mix macadam (table 400-13) (providing, laying, spreading and compacting graded stone aggregate to wet mix macadam sp
Sector: Road development