Details: strengthening the road from a v road to mattaparai road km 0/950 - 1/860 clearing the scrub jungles including all labour charges for all labour charges etc complete. picking the existing damaged bt surface to 3 - 5cm deep inccluding all labour charges laying us gravel including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specification etc. complete. km 0/0 - 1/0 km 1/ - 2/0 providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all othe
Sector: RDPR