Details: picking bt scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per technical specification clause 301.4. earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m and lift of 2m including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20a spreading the collected us gravel to watering and hand roller rolling including cost and supply of well gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform
Sector: RDPR