Details: earth work excavation for pipe line trench work in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring strutting and bailing out water wherever necessary and refilling the sides of foundation with excavation earth in layers of not more than 15cm thick will rammed and consolidated with initial leads and lists etc including leveling the sites complete complying with standard specification and as desired. twad sor-2024-25 pn:191 supply and delivery of the following specials including all cost and conveyance etc. complete.twad sor-2024-25 100mm sluice valve- twad pn:57 100mm sluice valve- twad pn:58 c.i specials- twad pn:73 110mm pvc pipe -6ksc- twad pn:5 110mm pvc coupling- twad pn:10 110mm pvc bend- twad pn:10 110mm pvc tee- twad pn:10 110mm pvc end cap- twad pn:10 plain cement concrete 1:2:4 (one cement, two crushed stone sand (m- sand) and four coarse aggregates) using 20mm size iss hbg metal including cost and convey
Sector: Municipality