Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, sand, silt or other loose soil and to full depth as may be directed except in hardrock reqiring blasting inclusive of shoring shuttering and bailing out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed depositing the surplus excavated soil with in the compound in places shown by the departmental officrs with initial lead and lifts and cleaning, levelling, the site etc., complete as per ss 20b for foundation supply, delivery and filling with stone dust from approved quarry in layer not more than 15 cm thick including watering with all layers and consolidation complying with standard specifications including cost and conveyance of sand at site and labour chrages and all other incidental charges etc., complete as per standard
Sector: RDPR