Details: improvements to the road from pananthoppu colony to kilcolony in paravakkal pt clearing the scrub jungles including cutting the scrubs and removing away from site etc complete earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting sidedrain etc, complete. as per ss20 a construction of granular sub base by providing well graded material (25 mm to 4.75 mm irc hbg metal @ 65 %,4.75 to 2.36mm irc hbg metal @20%&2.36 mm below irc hbg metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) y mix in place as per approved plans or as directed by the engineer (mix -in - place method) . providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) specification including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in su
Sector: RDPR