Details: construction earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 vibrated plain cement concrete 1:4:8 (one part of cement, four part of sand, eight part of aggregate) mix using 20mm iss hbg metal from approved quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 v,vi s25 steel shuttering with ms sheets and ms angels including fixing in position with country wood scantlings for drain side walls includi
Sector: RDPR