Details: earthwork excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (hard soil ) cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete cement concrete 1:1.5:3 using 20mm iss hbg metal for all rcc item of works excluding cost of rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the rcc floor or roof slabs
Sector: RDPR