Details: construction of threshing floor @ avanam anthoniyar kovil opposite (15.00x15.00m) in vilanur panchayat. earth work excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification ss20 b for narrow foundation. sand filling with m- sand including cost and conveyance of all materials to site and all labour charges etc., complete. cement concrete 1:4:8 mix using 40mm iss hbg metal including cost and conveyance of all materials to site and all labour charges etc., complete. refilling in foundation and basement with excavated earth in layers of not more than 15 cm thick well rammed watered and compacted including & conveyance and all labour charges etc., cement concrete 1:3:6 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . supplying and erecting centering for sides and soffits of rcc works of plane surfaces ment
Sector: RDPR