Description: Construction of High Level Bridge across Buckingham Canal at km 0 8 of Link Road Connecting Rajiv Gandhi Salai and ECR Name of work Construction of Highlevel Bridge Across Buckingham canal at km 0 8 of Link Road Connecting Rajiv Gandhi Salai and ECR
Details: (Small Vehicle Under Pass) SVUP Box 2 side Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) PCC Grade M15 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M35 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications for Base Slab RCC Grade M35 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications for Side Wall & Top Slab Supplying, Fitting and Placing un-coated FE 500D bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Tech
Sector: Road development