Details: construction of threshing floor in siruvakkam colony @ siruvakkam planchayat earthwork excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. supplying and filling in foundation and basement and trenches with filling sand in layers of not more than 15cm thick, well watered,rammed and consolidated complying with standard specification etc.,complete. cement concrete 1:4:8 mix using 40mm gauge hand broke
Sector: RDPR