Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete earthwork excavating and depositing on bank with initial lead of 10 metres and lift of 2 metres in all kinds of soil except medium rock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of 15 cm thick, watering and consolidation and depositing the surplus earth with in the compound in places as shown by the departmental officers with initial lead and lift, cleaning, leveling the site etc., complete complying with standard specifications removal
Sector: RDPR