Details: providing paver block at old vinnuvampattu in vinnuvampattu habitation in kalasapakkam kalasapakkam (length- 90m, width-3.00m). in kalasapakkam block under agamt - 2025-26 earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per is 20a. base course concrete with c.c.1:4:8 mix using 40mm i.s.s. size hbg metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification. centering and shuttering for sides including cost and convayance and labour charges etc complete. cement concrete c.c.1:2:4 hbg metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete
Sector: RDPR