Details: earth work excavation and depositing on bank with an initial lead of 10m initial lift of 2m in hard stiff clay, stiff block cotton soil and hard red earth shales, murram, ground stony earth and earth mixed with small bounders and hard gravely soil as per ss20b cement concrete 1:4:8 using 40 mm hbg metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification. supplying and erecting centering including cost and conveyance of all other labour charges etc., complete. plain cement concrete 1:3:6 using 20 mm hbg metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges etc., supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floor
Sector: RDPR