Details: removing of bed ash generated in power boiler # 4, 5 & 6 at energy dept - process (the rate quoted is exclusive of gst) loading of bed ash into trucks manually and dumping the same in the area identified by the engineer in charge within a lead of 4 kms (to & fro)
Sector: Industries and Factories