Details: clearing scrub jungle by cutting removing and depositing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness including cutting of trees upto 150mm girth.. as per morth rev.v.201 road a road b picking 5cm to 10cm old b.t surface and sectioning and to bring to camber and super elevation as directed by the departmental officers including labour charges for picking including hire charges for all tools and equipments employed and all other incidental charges etc., complete as per standard specification. road b construction of granular sub-base grade-v 200 mm thick by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete specification number as per morth rev.v 111,112,401,900). road a providing an
Sector: Road development