Details: clearing the light jungle on road side as per standard specification as directed by the departmental officers and including all other incidental charges etc., complete. as per morth vth revision 111, 112, 201 road-a road-b picking the existing bt surface, leveling and sectioning in accordance with specifications and as directed by the engineer. as per morth vth revision 111, 112, 202, 303.4.3, 501 road-a road-b providing and laying, spreading and compacting graded stone aggregate wet mix macadam specification including pre-mixing the material with water at omc in base mix plant (pugmill) carriage of mixed material by tipper to site and laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per morth vth revision 111, 112, 406, 900 road-a road-b providing and laying of prime coat using emulsion bitumen (ss1) at the rate of 7kg/10 sqm. over the wmm surface preparatory to another bituminous co
Sector: Road development