Details: construction of granular sub-base by providing close graded material,mixing in a machanical plant at omc,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,complete as per clause 401. providing and laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the materials with waterat omc in mechnanical mix plant carriage of mixed material by tipper to site laying inuniform layers with paver sin sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of morth rev-5 providing and laying of prime coat using bitumen emulsion (ssi rc drum) at the rate of 7 kg per 10sqm over the wmm surface preparatory to another construct
Sector: RDPR