Details: 1. construction of waiting shed at somanathapuram burial ground h/o. kurubarapalli - rs. 6.00 lakhs. earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. cement concrete 1 : 4 : 8 mix using 40mm hbg metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., random rubble masonry in cm 1:5 foundation and basement including simultaneously flush supplying and filling of conveyed earth with a lead of 5km for basement filling brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (one cement and five m.sand) including curing neat finishing, etc., complete complying with standard specifiction. supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 m height for plane surfaces as detailed below in all floors wi
Sector: RDPR