Details: part 1 : providing paver block at periyakottai rathanam house to murugan house h/o periyakottaiestimate amount rs. 4.10 lakhs earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20b cement concrete 1:4:8 mix using 40mm iss hbg metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3 supplying and erecting centering for core wall side with cost and conveyance of all materials and all labour charges etc., completed. plain cement concrete 1:2:4 (one cement, two m.sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. construction of granular sub base by providing well graded material (25 mm to 4.75 mm irc hbg metal @ 65 %,4.75 to 2.36mm irc hbg metal @20%&2.36 mm below irc hbg metal @15%)& (the material passing 4
Sector: RDPR