Details: earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m and lift of 2m including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water etc., in sdr soil- 1st depth collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, cement concrete 1 : 4 : 8 mix using 40mm hbg metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. cement concrete 1 :2: 4 mix using 20mm hbg metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. supplying & erecting centering for sides & soffits including necess
Sector: RDPR