Details: picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of morth providing and laying, spreading and compacting graded stone aggregates to wet mix macadam 150mm thick specification including premixing the materials with water at omc in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/ base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of morth providing and laying of prime coat using emulsion at the rate of 7 kg per ten square meter over the wmm surface including cost of emulsion
Sector: RDPR