Details: earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per ss 20b sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications centering charges for centering post and wooden planks including conveyance of all materials to site and proper centering etc complete. cement concrete 1:2:4 mix using 20mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 . cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete wearing coat cement concrete 1:1.5:3 mix using 20mm iss metal including cost and conveyance of all materials to site and all labour ch
Sector: RDPR