Details: earth work excavation and depositing on the bank with initial lead and lift of 10 metres and initial lift of 2 metres in hard stiff stiff clay stiff block cotton hard red earth murram, gravel stoney earth and earth mixed with small size boulders and hard gravelly soils (ss 20 b) etc., complete as per standard specification plain cement concrete using 1:4:8 mix ( one cement , four crushed stone sand and eight aggregates) using 40 mm iss hbg metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. tndss no: 28 v, vi (s2) v,vi (s5a) vii supplying, fabricating and placing in position of mild steel or tmt rods, including cost of steel and binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete as per ss. tndss no: 97 v,vi (s6) vii (s6) vii-3 supplying and erecting steel centering for sides and soffits including supports a
Sector: RDPR