Details: earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per ss 20b collection and supply of sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications plain cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 . providing and laying spreading and compacting graded stone aggregate to wet mix macadam(wmm) 250 mm thick, including premixing the material with water at omc in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory soil compactor to achieve the desired density includi
Sector: RDPR