Details: earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 meters and initial lift 2 metres and clearing and leveling the site etc. complete complying with standard specification. providing and laying, spreading and compacting graded stone aggregates to wet mix macadam 250mm thick specification including premixing the materials with water at omc in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base/ base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour
Sector: RDPR