Details: removal of rank vegetation/ weeds and undesirable vegetation from shoulders, embankment slopes upto row (both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside row as per direction of engineer- ln-charge and as per maintenance standards clause 3.3 (frequency will be once in a quarter) providing spot reconditioning, reconstruction and regravelling to repair sepcific erosion or other damages for restoring the eroded area to originally constructed cross section on cuts and ills slopes/shoulders conforming to technical specifications clause no.3002. fill material should be brough from borrow areas located outside row conforming to technical specification no.305. watered and well compacted with plate compactor or power rammerwith all leads and lifts as directed by the engineer ( quantity to compacted fill material to be measured oncorss sectional area basis) clearing cleaning, deepening and reshap
Sector: Road development