Details: earth work exception for foundation in all solids and sub-solids to full depth as may be directed except in hard rock requiring blasting but inclusive shoring, structing and baling out water wherever necessary and filling the sides of foundation with excavated earth in layer of not more than 15cm thick well rammed and consolidated and depositing the surplus earth in all places shown by the department officers with initial lead and lifts etc. including leaving the sites complete complying with standard specifications etc complete. plain cement cement 1:4:8 mix using 40 mm iss gauge hbg metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications. random rubble masonry in cement mortar 1:5 for foundation and basement using new stones including necessary provision for bond stones with simultaneous flush pointing with the same mortar above ground level c
Sector: RDPR