Details: providing of ro water palnt near arulmigu thimmaraya swamy temple at gudichetlu village h/o thummanapalli earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. cement concrete 1 : 4 : 8 mix using 40mm hbg metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed random rubble masonry in cement mortar 1 : 5 for foundation and basement using new stones including necessary provision for bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. supplying and filling foundation and basement with filling sand in layers not more than 15cm . thick well ramed, watered and compacted complete complying with stanard specification. filling in baseme
Sector: RDPR