Description: Providing Footpath with RCC Culvert at Anaipallam near Hostel SADP 2024 25 Name of Work Providing Footpath with RCC Culvert at Anaipallam near Hostel
Details: Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in Soft disintegrated rock, Laterite, Soft rock or Kankar, not requiring blasting etc. complete. complying with std. specifications. Earth work excavation for Open Cutting and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. Supplying and erecting shuttering including Necessary supports for plain surfaces such asR.C.C. Columns for
Sector: RDPR