Details: dismantling, clearing away and carefully stacking materials useful for re-use for any thickness plain cement concrete etc.complete earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. plain cement concrete 1:4:8 mix (one part cement, four part m sand and eight part of aggrigate) using 40 mm size iss hbg metal from approved quarry including cost and conveyance of all materials to site. loading and unloading charges and labour charges for mixing. laying and curing etc., complete as per tndss no : 28 & vi (s2) vi (s5a) vii standard specifications as directed by engineer incharge. supplying and er
Sector: RDPR