Details: construction of anganwadi building at pereripudhur village h/o sitheri. (dpi24rur005) earthwork excavation for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc. complete. main column, toilet column, gb main wall alround, cross wall, d/f column area, d/f column area, step infront of building, septic tank, inlet outlet chamber, plinth protection wall, ramp wall to ewc, ramp wall to hall. supplying and filling foundation and basement with filling sand in layers not more than 15cm . thick well ramed, watered and compacted complete complying with stanard specification.fooring, hall, kitchen, store, baby to
Sector: RDPR