Details: charges for conducting geological survey drilling of 150mm dia vertical bore well in hard rock area using bore well rig including conveyance and erecting of rig and all labor charges etc upto 150mm form 151 -180m from 181 - 210m from 211 - 240m supply and fixing of 200mm rs dia pvc casing pipe including cost of materials and all labor charges etc., earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales,murram, ordinary earth, earth mixed with 50% fair sized boulders etc., with initial lead and lifts including laying, sprading, levelling sectioning breaking clods etc., incuding all incidential changes complete as per standard specification for foundation ss 20b cement concrete of mix 1:4:8 (one part of cement four part of msand eight part of aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bu
Sector: RDPR