Details: earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per ss 20b cement concrete 1:4:8 mix using 40mm iss hbg metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for r c c column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25m x 25mm x 3mm for boarding laid over silver oak etc., cement concrete 1:3:6 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed
Sector: RDPR