Details: earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per ss 20b cement concrete 1:4:8 mix using 40mm iss metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. for shuttering - below sill level for shuttering - above sill level for deck slab centering cement concrete 1:3:6 mix using 40mm hbg metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . cement concrete 1:1.5:3 mix using 20mm iss hbg metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 . suppl
Sector: RDPR