Details: earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. cement concrete 1:2:4 (one cement, two m.sand and four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all rcc items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating, finishing, curing, etc. and providing fixtures like fan clamps in the rcc floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with cement mortar 1:3 (one cement and three sand) and kraft paper laid over it without cl