Details: earth work excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders ss.20b and sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 jointing hdpe pipes and specials by buttfusion welding / electro fusion welding jointsusing fusion equipment as per iso 21307-2011 and as per is 7634 (part-2) : 2012including cost of hire charges for fusionequipment power supply arrangements etc.,complete as per directed by twad boardofficers. jointing hdpe pipes and specials by buttfusion welding / electro fusion welding jointsusing fusion equipment as per iso 21307-2011 and as per is 7634 (part-2) : 2012including cost of hire charges for fusionequipment power
Sector: RDPR