Details: strengthening of puthu theru salai in madathikkadu panchayat km 0/087-0/165 earth work excavation from borrow pits for filling in all classes of soil as per ss 20a, laying compacting, in layers not more than required dry density at 100% compaction as per standard specification . picking the existing bt surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc., com providing and laying water bound macadam grading - iii(63mm to11.20mm)irc hbg of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.21 for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specificati
Sector: RDPR