Details: earth work excavation in all types of soils for the construction of roadway embankment to the required line, grade, and level as per drawings including stacking reusable materials and disposal of unwanted excavated material with a lead of 1 km and all lift as per technical specification clause 301 of mort&h specifications complete and as directed by engineer for cutting picking the existing bt surface upto 50mm thick as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc.,complete as per clause 111, 112, 202, 305.4.3 of morth rev-5. wet mix macadam (table:400-13): providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix p
Sector: Forest and Environment